The project consists of the construction of a road tunnel lowering every crossroads along the boulevards of the Almohades, Sidi Med Ben Abdellah et Zaid ou Hmed and leading to the FAR Avenue after The Zelaqa crossroad. The development concerns 2270 meter linear of which 1817m underground.
On the surface, the project consists of:
Underground, the project consists of: